A 12 × 12 ft patio in 4×8 in pavers,
No joint, 5% waste. Each paver covers 32 in², so 144 ft² takes exactly 648 pavers, or 681 with waste. A 4 in base is 1.778 yd³ (about 2.489 tons), and 1 in of sand is 0.444 yd³, or 24 bags of 0.5 ft³.
Estimate how many pavers, how much base gravel and how many bags of sand your patio needs.
Base is the compacted depth. Loose gravel settles when you compact it, and this count does not add extra for that. Base depth is guidance only.
Enter your patio's size and the paver you've picked to estimate all three layers: the compacted gravel base, the sand bed and the pavers on top. That way you can price the whole job, not just the stone you'll see.
Measure the finished patio size, not the dug-out area. If you're adding edging, the paver count stops at the inside of the edging. For L-shaped or irregular patios, split the shape into rectangles, add up the square feet and enter the total. Keep a few spare pavers after the job. Matching a color batch years later for a repair can be hard.
Each paver covers its own size plus one joint width, so the count is your area divided by that, plus waste. Base and sand are the area times each layer's depth, converted to cubic yards, tons and bags.
No joint, 5% waste. Each paver covers 32 in², so 144 ft² takes exactly 648 pavers, or 681 with waste. A 4 in base is 1.778 yd³ (about 2.489 tons), and 1 in of sand is 0.444 yd³, or 24 bags of 0.5 ft³.
The joint makes each paver's footprint slightly larger, so the raw count falls to 618.70, or 650 pavers with 5% waste. That's 31 fewer than with no joint, so set the joint carefully.
10% waste and a 6 in base. 200 slabs plus 10% gives 220. The base is 3.704 yd³ (5.185 tons), and the sand is 0.617 yd³, or 34 bags.
90 ft² at 2.667 pavers per square foot is 240 pavers, and 264 with 10% waste for all the angled cuts. A 4 in base is 1.111 yd³ (1.556 tons), and the sand takes 15 bags.
| Paver size | Per ft² (no joint) | Per ft² (1/8 in joint) |
|---|---|---|
| 4 × 8 in | 4.50 | 4.30 |
| 6 × 6 in | 4.00 | 3.84 |
| 6 × 9 in | 2.67 | 2.58 |
| 12 × 12 in | 1.00 | 0.98 |
| 16 × 16 in | 0.56 | 0.55 |
| 24 × 24 in | 0.25 | 0.25 |
Waste isn't included here. Add it on top.
The base figure is the compacted depth. Loose gravel settles when you compact it, so many installers order extra. The tool doesn't add a compaction factor yet, so ask your supplier how much extra to allow for the stone you're buying. Base depth is guidance only. Soil, frost and traffic all affect what's right for your site.
Divide your area by the square feet each paver covers (including the joint), then add waste. A 12 × 12 ft patio in 4×8 pavers needs 648, or 681 with 5% waste.
Enter the joint width and the tool adds it to each paver's size. With 1/8 in joints, the same 12 × 12 patio needs 650 instead of 681.
Area × base depth. A 144 ft² patio with a 4 in base needs 1.778 yd³, about 2.5 tons at 1.4 tons per yard.
Usually a 1 in bed. For 144 ft² that's 0.444 yd³, or 24 bags of 0.5 ft³.
About 10 to 15%, versus 5% for straight running bond. Those patterns create many more cuts.
Pick the circle shape and enter the diameter. The tool uses π × radius² for the area. Plan on the higher waste range because every edge paver is cut.