A 10 × 10 ft shed pad, 4 in thick.
10 × 10 × (4 ÷ 12) = 33.33 ft³, or 1.235 yd³. With no waste that's 112 bags of 40 lb, 75 of 60 lb or 56 of 80 lb. Add the default 10% and it becomes 1.358 yd³: 123 × 40 lb, 82 × 60 lb or 62 × 80 lb.
Work out cubic yards and how many 40, 60 or 80 lb bags you need for a slab, round pad or post holes.
Ready-mix is usually cheaper once you're past about 1 cubic yard. This is guidance, not a price quote. Ask the supplier about short-load fees.
Follow the water amount printed on the bag or the supplier's instructions. Extra water makes concrete easier to pour but weaker.
Enter the shape and size of your pour to get cubic feet, cubic yards and bag counts for 40, 60 and 80 lb premix. It handles square slabs, round pads and post holes with the post subtracted, and adds a waste allowance so you don't run short halfway through.
The calculator finds the volume in cubic feet, adds waste, then divides by 27 for cubic yards and by each bag's yield for a bag count. For post holes, it subtracts the space the post takes up.
Quick check: 27 ft³ ÷ 0.60 ft³ = 45 bags of 80 lb mix per cubic yard, the same figure Home Depot lists on its 80 lb bags.
10 × 10 × (4 ÷ 12) = 33.33 ft³, or 1.235 yd³. With no waste that's 112 bags of 40 lb, 75 of 60 lb or 56 of 80 lb. Add the default 10% and it becomes 1.358 yd³: 123 × 40 lb, 82 × 60 lb or 62 × 80 lb.
Holes 10 in across and 36 in deep, each holding a 4×4. Each hole is π × 5² × 36 = 2,827.4 in³, minus the post's 3.5 × 3.5 × 36 = 441 in³. Across 10 holes that's 13.81 ft³ (0.511 yd³), so 47 × 40 lb, 31 × 60 lb or 24 × 80 lb bags with no waste.
24 × 20 ft at 5 in with 5% waste is 200 ft³ (7.407 yd³), or 7.778 yd³ with waste. That's 350 bags of 80 lb mix, which is a lot of mixing. This is the kind of job where the calculator suggests pricing ready-mix.
12 ft across and 4 in thick: π × 6² × (4 ÷ 12) = 37.70 ft³, or 1.396 yd³. With 0% waste, that's 63 bags of 80 lb mix. With the default 10% waste it's 41.47 ft³ (1.536 yd³): 139 × 40 lb, 93 × 60 lb or 70 × 80 lb.
| Thickness | Area 1 yd³ covers | 80 lb bags per yd³ |
|---|---|---|
| 3.5 in | 92.6 ft² | 45 |
| 4 in | 81.0 ft² | 45 |
| 5 in | 64.8 ft² | 45 |
| 6 in | 54.0 ft² | 45 |
| 8 in | 40.5 ft² | 45 |
Bags per cubic yard by size: 90 × 40 lb, 60 × 60 lb, 45 × 80 lb. One 80 lb bag covers about 1.8 ft² at 4 in thick.
As a rough guide, ready-mix usually works out cheaper once you're past about 1 cubic yard. Below that, bags are easier to handle and you don't pay for a minimum load. Treat this as a rule of thumb, not a price quote. Enter your local bag and per-yard prices in the tool to compare them for your job, and ask the supplier about short-load fees. Whichever you choose, follow the water amount printed on the bag or the supplier's instructions. Extra water makes concrete easier to pour but weaker.
At 4 in thick, a 10 × 10 slab is 1.235 yd³. With 10% waste, buy 62 bags of 80 lb mix, 82 of 60 lb or 123 of 40 lb.
45. A cubic yard is 27 ft³ and each 80 lb bag yields 0.60 ft³.
Multiply the square footage by the thickness in feet (inches ÷ 12), then divide by 27. For 100 ft² at 4 in: 100 × (4 ÷ 12) ÷ 27 = 1.235 yd³.
Work out the hole's volume, π × radius² × depth, and subtract the part the post takes up. A 10 in hole 36 in deep around a 4×4 takes about 1.38 ft³. That's about 2.3 bags of 80 lb mix (2.5 with the default 10% waste), so you'd buy 3.
10% is the default and covers spills, uneven ground and form bowing on most small jobs. Go higher if your base isn't level.
Prices vary a lot by region and brand. Enter your price per bag and per cubic yard, and the calculator totals both options for you.