How cubic yards are calculated
A cubic yard is a cube 3 feet on each side, so it holds 3 × 3 × 3 = 27 cubic feet. To fill an area, multiply its area in square feet by its depth in feet, then divide by 27. Depth is usually measured in inches, so divide the inches by 12 first. The calculator does both steps for you and adds the waste allowance before rounding.
The default example is a bed 20 feet long and 10 feet wide, filled 4 inches deep. Its area is 200 square feet and its volume is 200 × 4 ÷ 12 = 66.67 cubic feet, or 2.47 cubic yards. Adding 5% gives 2.59 cubic yards, so you would order 3 yards. At $40 a yard that is an estimated $120 before delivery.
Choosing a shape
Rectangles use length × width. Round areas, such as a tree ring or a circular patio, use π × (diameter ÷ 2)², so measure straight across the middle. Triangles use base × height ÷ 2, where the height is measured at a right angle to the base, not along a slanted side.
Many beds and driveways are L-shaped. Split the L into two rectangles that do not overlap, enter each one's length and width, and the calculator adds the two areas. For more complicated outlines, break the space into several simple shapes, run each one, and add the yards together before you round up.
Why the answer rounds up
Bulk suppliers sell by the yard, and coming up a little short leaves a thin patch that is hard to fix later. The calculator always rounds the needed amount up to the next whole yard after adding waste. An exact whole number, such as 3.00 yards, stays at 3 rather than jumping to 4.
Some yards sell half or quarter yards, and bagged products are sold by the cubic foot. If your supplier allows smaller amounts, use the exact figure shown under the rounded one. Loose materials settle and compact, so 5 to 10% extra is common for mulch and soil; compacted gravel bases often need more.
Metric measurements
Choose meters and centimeters to enter the length and width in meters and the depth in centimeters. The calculator converts them to feet using the exact definition 1 foot = 0.3048 meter, so a metric job and the same job measured in feet give the same cubic yards. It also shows the volume in cubic meters.
One cubic yard is about 0.7646 cubic meter, and one cubic meter is about 1.308 cubic yards. If a supplier quotes in cubic meters, use the metric volume line; to convert other volumes, such as gallons or liters, use the volume converter linked below.