Compare the same usable parts over the same period
Start with one defined production requirement: the number of usable parts you expect to need each year. Use the same part specification, material, finish and acceptable quality when obtaining an outsourcing quote and estimating your own production cost. A cheaper quote for a different deliverable is not a like-for-like comparison, even if the arithmetic is correct.
The tool repeats the stated annual volume over the comparison period. It does not check printer throughput, calculate print hours or confirm that one machine can meet the demand. Evaluate available capacity and production timing separately before relying on a cost scenario. The lower modeled total identifies a cost difference under your inputs, not the best manufacturing arrangement for every purpose.
Separate the purchase, recurring and per-part amounts
Purchase and setup is the new upfront spending assigned to the in-house option. Include the equipment and initial setup items you want compared. Annual fixed in-house cost is a recurring amount that does not change with the part count in this model. Put variable production spending in the per-usable-part field instead of counting it again in annual fixed cost.
Your in-house unit figure can aggregate material, power, incremental labor, consumables and the allowance you choose for unsuccessful prints or finishing. Formlabs identifies equipment, materials and labor as cost categories worth evaluating, but this calculator does not price them for you. Build a documented unit estimate that matches your process rather than treating a material-only figure as an all-in cost.
Use relevant and nonduplicated cost estimates
OpenStax's make-or-buy analysis distinguishes costs that change between alternatives from costs that remain regardless of the decision. For a forward-looking comparison, do not treat money already spent as a new printer purchase. If you already own equipment, enter only the new upfront outlay relevant to the scenario and consider any omitted opportunity cost separately.
Use an outsourced unit amount appropriate to your order size and requirements. If shipping, setup, inspection or order fees apply, allocate those costs into the quote you enter or evaluate them outside the result. There is no separate fixed outsourcing-fee input. A positive annual fixed cost on the in-house side is charged throughout the period, even if annual demand is zero.
Worked example for a three-year requirement
The demonstration uses $1,500 of purchase and setup cost, $2 per usable in-house part, $8 per outsourced part, 500 usable parts per year and $300 of annual fixed in-house cost. The period is three years. These are editable example assumptions, not current printer prices, supplier quotes or typical production-cost claims.
The annual in-house recurring amount is $300 plus 500 times $2, or $1,300. Three years of that amount plus the initial $1,500 gives an in-house total of $5,400.00. Outsourcing 500 parts a year for three years at $8 each totals $12,000.00. Savings with in-house production are $6,600.00, and the lower modeled cost is in-house printing.
Read the savings direction and test the horizon
Savings with in-house production equal the outsourcing total minus the in-house total. A positive result means the modeled in-house option costs less by that amount. A negative result means outsourcing costs less; it is not a second charge to add. An exact tie means the two unrounded totals match for the supplied assumptions.
The upfront amount is counted once in full. Recurring costs and annual demand scale with the year count, including a fractional year. A half-year scenario therefore includes the entire purchase and setup cost but half the stated annual recurring amounts and volume. The tool does not round a prorated production quantity to a procurement lot or whole batch, and it does not calculate a break-even volume.
Recognize the limits of a constant-cost comparison
Costs stay at the entered rates throughout the modeled period. No discount rate, financing, tax, depreciation, price escalation, replacement purchase, resale proceeds or production revenue is calculated. Fixed and variable cost assumptions also require a suitable operating range: if more demand needs another printer or a different staffing arrangement, revise the inputs rather than assuming capacity expands for free.
Cost is only one part of the decision. Lead time, quality, equipment suitability, supply reliability and the work needed to operate the process require their own review. Keep those considerations beside the calculation. Changing a cost estimate can show sensitivity, but it does not quantify an unentered risk or prove that the less expensive option will meet your requirements.
Input limits, precision and controls
Purchase/setup and annual fixed cost accept zero through $100,000,000. Each unit cost accepts zero through $1,000,000, annual demand is a whole number from zero through 1,000,000 parts, and the period must be greater than zero and no more than 50 years. These are numeric bounds, not statements about suitable printer sizes or purchasing volumes.
Blank, nonnumeric, negative or out-of-range values, a fractional annual part count, or a nonpositive period show a message and clear every result. Calculations retain intermediate precision; monetary outputs show two decimals. The lower-cost label compares unrounded totals, so sub-cent differences can remain even when displayed dollar totals look equal. Valid edits recalculate locally, Calculate repeats the calculation, and Reset to example restores the demonstration.